• CLIENT : Surat Municipal Corporation
  • BUILT UP AREA: 17985SQ.MT
  • LOCATION : Palanpur, Surat.
  • FACILITIES:

  • Bus Terminal.
  • Ticket and Admin Area.
  • Shops.
  • Public Toilet.

 

The proposed bus terminal connects Pal gam to Rander, Bhesan gam, Adajan, Umragma and other core city areas. It is the citys first bus terminal to have 50 electric bus charging points. The design was proposed in 2 phases, the first phase is completed, the second proposes small shops which can be leased or sold to small vendors at reasonable price by the SMC.